This bathroom hadn’t been touched since the 1980s. The shower was weak, the pipes were a patchwork of old repairs, and the room was always cold.
What we did
We stripped the room back to the walls, replaced all the pipework, and fitted a new bath with a thermostatic mixer shower over it, a new basin and a close-coupled toilet. A heated towel rail keeps the room warm.
The result
A bright, warm bathroom with a shower that actually works, finished in seven working days.